Construction Work up to 2007
|
|
|

prior to the move1955 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

getting to grips with the Campbell2039 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

crank case being lifted off1591 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

crank case being removed on the Campbell1513 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

Mirrlees engine needs to be moved to allow access to the Campbell1556 views
|
|

lifting the crank shaft out1489 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

pieces of the giant Campbell waiting to be moved1511 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

stripped and waiting to be moved1477 viewsthe engine had to be dismantled in the car park prior to its move to a new location
|
|

Crane at work on the Campbell1541 viewsBehind the generator house you can see the crane manoevering parts of the Campbell into place outside the museum fence.
|
|

Left a bit1538 views
|
|

Preparing the foundations1825 views
|
|

Campbell Engine being reassembled outside museum entrance1590 viewsThe flywheel being lowered into place.
|
|
|