|
|

Engine information board4726 viewsDetails of the engine that were displayed at the college
|
|

The load can be seen in front of the crane3817 viewsThe crankshaft and water brake prior to unloading
|
|

The water brake is hooked up ready to unload3746 viewsThe Sutton crane is ready to lift the 17 ton weight
|
|

Crane unloads the Water Brake weighing 17 tons3715 views
|
|

Crankshaft being unloaded by the Sutton crane3648 viewsUnloading continues
|
|

17 ton crank being lowered into place3943 viewsbelow the crank you can see the giant flywheel
|
|

Don Foden applies preventative oil against rust4903 viewsDon is an ex-Mirrlees man. He was the engine-build and test foreman then Plant Manager. He grins and tells people he now brushes up at the Anson.
|
|

Flywheel arriving at the museum 2nd April 20075288 viewsThe 25 ton flywheel can be seen as the lorry arrives in the museum drive
|
|

The giant flywheel only just manages to fit up the museum drive3905 viewsThe flywheel can be seen just skirting the tree on the left
|
|

I don't think they will manage to lift it off on their own3834 viewsPreparing the 25 ton flywheel for unloading
|
|

Left a bit3564 viewsGeoff Baker helps the crane driver position the flywheel during its unloading
|
|

25 ton flywheel being placed into position3690 viewsin its final resting place - for now
|
|
| 42 files on 4 page(s) |
2 |  |
|