Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Image search results - "anson museum building"
Preparing the foundations
2001 views
View between the main hall and the new Memorial Building
2920 views
Foundations being laid
1740 views
Almost finished
1735 views
Most of the brickwork is complete before doors and glass can be fitted
All ready to dig out the foundations
1695 views
The concrete for the floor had to be laid in sections
1748 views
The foundations being dug out
1729 views
Another section of concrete goes down
1752 views
Foundations for the back work being prepared
1695 views
The engine over the Stott steam engine can be seen in the background
Another delivery of concrete for the floors arrives
1768 views
Trees down the drive need to be taken down to widen the area
2123 views
Work on widening the drive and entrance area before new surface laid
1835 views
76 files on 7 page(s)
1
2
3
4
5
6
7