Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Archive photos of engines and museum views
>
Construction Work up to 2007
Most viewed - Construction Work up to 2007
getting to grips with the Campbell
2226 views
the engine had to be dismantled in the car park prior to its move to a new location
Trees being removed to widen the driveway
2137 views
Trees down the drive need to be taken down to widen the area
2132 views
prior to the move
2130 views
the engine had to be dismantled in the car park prior to its move to a new location
More stone ready for flattening
2023 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Preparing the foundations
2009 views
Work on widening the drive and entrance area before new surface laid
1840 views
Another delivery of concrete for the floors arrives
1776 views
More stone waiting to be laid
1775 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Campbell Engine being reassembled outside museum entrance
1773 views
The flywheel being lowered into place.
crank case being lifted off
1772 views
the engine had to be dismantled in the car park prior to its move to a new location
Mirrlees engine needs to be moved to allow access to the Campbell
1761 views
105 files on 9 page(s)
1
2
3
4
5
6
7
8
9